Like all Kantner & Company documents, these are written lean and to the point, to minimize paperwork and bureaucracy. We provide them in Microsoft Word or Excel format, readily available to anyone with a computer. Order the complete set and save over $100!
| Document |
Description |
Price |
|
| Ferrous Processing And Inspection Procedure |
Generic step by step procedure that specifies ferrous material processing and
preparation activities along with verification requirements.
|
7.95 |
 |
| Nonferrous Processing And Inspection Procedure |
Generic step by step procedure that specifies nonferrous material processing and
preparation activities along with verification requirements.
|
7.95 |
 |
| Consumer Sales Contracts Procedure |
Generic procedure spelling out requirements for generating, documenting, and
processing contracts for sales of material to scrap recycling consumers.
|
7.95 |
 |
| Corrective Preventive Action Procedure |
Specifies processes for corrective action (to prevent actual discrepancies from
recurring) and potential problems (to prevent potential problems from occurring) in a
Quality Management System.
|
7.95 |
 |
| Data Analysis And Reporting Procedure |
Generic procedure outlining steps for gathering, analyzing, and reporting on data
related to process improvement activities.
|
7.95 |
 |
| Direct Shipments - Brokerage Procedure |
Addresses the steps for purchase and sales of material direct-shipped from supplier /
source to consumer.
|
7.95 |
 |
| Document Control Procedure |
Specifies controls for instructional documents that make up the Quality Management
System.
|
7.95 |
 |
| Internal Audit Procedure |
Outlines the processes for internally auditing the scrap recycling organization's Quality
Management System processes, to assure that they are effective.
|
7.95 |
 |
| Maintenance Infrastructure Work Environment Procedure |
Spells out processes for maintenance of key infrastructure and work environment
aspects of a scrap recycling organization.
|
7.95 |
 |
| Management Review Procedure |
Outlines the steps the scrap recycling organization takes for the review of the Quality
Management System by top management, to assess its status, as well as problems,
successes, and opportunities for improvement.
|
7.95 |
 |
| Policies And Objectives Procedure |
Outlines the means by which the scrap recycling organization's top management sets
quality related policies and objectives, so that the Quality Management System is
focused on improvement.
|
7.95 |
 |
| Processing Consumer Material - Toll Work Procedure |
Spells out steps for assuring quality and customer satisfaction for toll processed
material (i.e. consumer owned material that is processed and returned to consumer for
a fee).
|
7.95 |
 |
| Purchasing - MRO Procedure |
Specifies the ways the scrap recycling organization selects MRO vendors consistent with the
organization'squality policies, and monitors their performance.
|
7.95 |
 |
| Purchasing Scrap Procedure |
Maps out generic steps for purchase of scrap / raw material, both retail (peddler) and
industrial.
|
7.95 |
 |
| Records Control Procedure |
Specifies controls for records required for ISO 9001 Quality Management System.
|
7.95 |
 |
| Shipping - Delivery Procedure |
Sets forth generic steps for completing load-out, final inspection, shipment, and
delivery of material to scrap recycling consumers.
|
7.95 |
 |
| Training Competence Procedure |
Outlines the steps the scrap recycling organization takes to assure that all personnel
understand the quality controls associated with their jobs, as well as other quality
responsibilities, and are competent to carry out their jobs in a responsible manner.
|
7.95 |
 |
| Useable Material Process Procedure |
Step by step generic process for handling useable material processing, sales, etc.
|
7.95 |
 |
| Document |
Description |
Price |
|
| Auto Flattener Instruction |
This generic instruction outlines control steps for an auto flattener process. Fully
customizable, it is specific to ferrous scrap recycling operations.
|
7.95 |
 |
| Baler - Ferrous Instruction |
Generic instruction for a typical ferrous baler process.
|
7.95 |
 |
| Baler-HRB Instruction |
This customizable template supplies generic instructions for HRB baler quality
management in a ferrous environment.
|
7.95 |
 |
| Cast Breaker Instruction |
This generic instruction outlines control steps and quality management for a cast
breaker process. Specific to scrap recycling operations.
|
7.95 |
 |
| Crane Crawler Hydraulic Instruction |
Generic quality management instruction for operating hydraulic crawler crane in a
typical ferrous scrap recycling operation.
|
7.95 |
 |
| Crane Electromagnet Instruction |
Generic quality management instruction for operating electromagnetic crane in a
typical ferrous scrap recycling operation.
|
7.95 |
 |
| Crane Locomotive Instruction |
Generic quality management instruction for operating locomotive crane in a typical
ferrous scrap recycling operation.
|
7.95 |
 |
| Ferrous Rail Car Loading Gondola Instruction |
Generic quality management instruction for loading gondola rail cars in a typical
ferrous scrap recycling operation.
|
7.95 |
 |
| Logger-Baler Instruction |
This generic instruction outlines control steps and quality management for a loggerbaler
process. Specific to ferrous scrap recycling operations.
|
7.95 |
 |
| Shear - Double Instruction |
This generic instruction outlines control steps for a double shear production process.
Fully customizable, it is specific to ferrous scrap recycling operations.
|
7.95 |
 |
| Shear - Portable Instruction |
This generic instruction outlines control steps for a portable shear production process.
Fully customizable, it is specific to ferrous scrap recycling operations.
|
7.95 |
 |
| Shear Instruction |
This generic instruction outlines control steps for a standard shear production process.
Fully customizable, it is specific to ferrous scrap recycling operations.
|
7.95 |
 |
| Shredder Eddy Current Instruction |
This generic instruction outlines control steps for a shredder / eddy current production
process. Fully customizable, it is specific to ferrous scrap recycling operations.
|
7.95 |
 |
| Torching - Production Instruction |
This document lists generic instructions for ferrous (steel yard) torching, including
quality issues.
|
7.95 |
 |
| Document |
Description |
Price |
|
| Aluminum Cans Instruction |
This generic instruction outlines control steps for an aluminum can production process.
Fully customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Baler - HRB Instruction |
This customizable template supplies generic instructions for HRB baler quality
management.
|
7.95 |
 |
| Baler-Downstroke Instruction |
This customizable template supplies generic instructions for downstroke baler quality
management in a nonferrous environment.
|
7.95 |
 |
| Battery Management Instruction |
This document lists generic instructions for quality system management of vehicle
batteries, typically handled in nonferrous areas.
|
7.95 |
 |
| Briquetting Instruction |
This generic instruction outlines control steps for a briquetting process. Fully
customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Crushing Turnings - Large Instruction |
This generic instruction outlines control steps for a large turnings crushing process.
Fully customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Crushing Turnings - Small Instruction |
This generic instruction outlines control steps for a small turnings crushing process.
Fully customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Metal Cleaning And Sorting Instruction |
This document lists generic instructions for metal cleaning and sorting in a nonferrous
(metals room) processing area.
|
7.95 |
 |
| Metal Identification Instruction |
This work instruction provides steps for correct identification f a variety of metals
commonly found in scrap recycling operations. Fully editable.
|
7.95 |
 |
| Plasma Cutter Instruction |
This document lists generic instructions for plasma cutting, typically done in a
nonferrous (metals room) processing area.
|
7.95 |
 |
| Shear (Alligator) Instruction |
This generic instruction outlines control steps for an alligator shear process. Fully
customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Truck Loading Instruction |
Generic quality management instruction for loading trucks in a typical nonferrous
scrap recycling operation.
|
7.95 |
 |
| Tube Flattener Chopper Instruction |
This generic instruction outlines control steps for a tube flattening and chopping
process. Fully customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Wire Chopping Instruction |
This generic instruction outlines control steps for a wire chopping process. Fully
customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Wire Granulator Instruction |
This generic instruction outlines control steps for a wire stripping process. Fully
customizable, it is specific to nonferrous scrap recycling operations.
|
7.95 |
 |
| Railroad Boxcar Loading Instruction |
Generic quality management instruction for loading rail boxcars in a typical nonferrous
scrap recycling operation.
|
7.95 |
 |
| Wire Stripper Instruction |
This document lists generic instructions for wire stripping in a nonferrous (metals
room) processing area.
|
7.95 |
 |
| Document |
Description |
Price |
|
| Calibration Control Log Sheet |
Form for tracking calibration requirements and activity for scrap facility measuring
devices such as scales, radiation monitors, etc.
|
7.95 |
 |
| Corrective Action Request |
Tracks the 8 step corrective action process for addressing actual environmental
problems as well as nonconformities in the Environmental Management System.
|
7.95 |
 |
| Infrastructure Work Environment Schedule |
Generic document for determining and recording the handling of certain infrastructure
and work environment aspects of a typical scrap recycling facility.
|
7.95 |
 |
| Internal Audit Report |
For recording results of internal audits/ evaluation of compliance of the Quality
Management System. Summarizes outcomes and the status of the QMS.
|
7.95 |
 |
| Preventive Action Request |
Form for recording the steps taken to address potential quality problems as well as
potential discrepancies in the Quality Management System.
|
7.95 |
 |
| Records Schedule |
Identifies records relevant to the Quality Management System; specifies details such
as location, owner, retention interval, etc.
|
7.95 |
 |
| Satisfaction Survey - Consumer |
Generic consumer satisfaction survey that gathers ratings on three key dimensions of
consumer satisfaction.
|
7.95 |
 |
| Satisfaction Survey - Industrial Suppliers |
Generic satisfaction survey that elicits feedback from industrial suppliers to a typical
scrap recycling facility.
|
7.95 |
 |
| Suspect Items Guide |
Lists scrap materials and items that are generally considered nonconforming, or
potentially nonconforming. Specifies what is to be done with such items (i.e. rejection,
disposal).
|
7.95 |
 |
| Training Plans |
For each scrap recycling organization job function, lists the qualifications (i.e.
prerequisites) for being in the job, as well as areas that the person must be trained and
competent in, to meet his/her Quality Management System responsibilities. Includes
generic plans for some 20+ typical scrap recycling organization functions.
|
7.95 |
 |
| Vendor Corrective Action Request |
Alerts MRO vendors who have potentially violated Company quality policy; asks them
to respond with the steps they will take to avoid further problems.
|
7.95 |
 |
| Vendor (MRO) Selection Form |
Records assessment of potential company MRO vendors from a quality standpoint,
based on a defined set of criteria.
|
7.95 |
 |